
The bridge connecting 2 areas of Bukit Indah City located on the Cipularang KM 71+100 toll road is targeted to be completed on May 23, 2024.
PT Asri Karya Lestari signed a work contract for the construction of a KM 71+100 connecting bridge. This contract was made in Jakarta on Friday (February 24, 2023). PT Asri Karya Lestari collaborates with PT Besland Pertiwi and PT Indotaisei Indah Development.
PT Asri Karya Lestari was established in 2008 engaged in general contractors led by Mr. Sudjatmiko as president director of PT Asri Karya Lestari. PT Asri Karya Lestari also previously built several bridges such as South City Pondok Cabe Bridge, Lookeu River Bridge NTT, Jemb Asulait II, Baukama Bridge and Antelope Bridge.
On this occasion, PT Besland Pertiwi led by Adhi Indrawan as President Director and PT Indotaisei Indah Development led by Katsuyuki Sakai and Kuky Permana as President Director and Director, who entrusted the construction of the KM 71+100 connecting bridge to PT Asri Karya Lestari.
The construction of the Connecting Bridge on the Cipularang Toll Road has a contract value of RP 86,236,530,000 M. The contract value has been agreed from the auction results made by PT Besland Pertiwi and PT Indotaisei Indah Development. In the construction of this Connecting Bridge using the BorePile foundation structure.
It is hoped that after the completion of the construction of this bridge can accelerate road access 2 beautiful hill city areas separated by the Cipularang Toll Road.