Install Stell Box Girder, PT AKL Optimistic to Complete Construction of Deltamas Flyover in March 2024

  • Post author:

The highway from the Japek toll gate and Bekasi Regency Government Office experiences increasingly severe congestion every day. It is estimated that congestion will increase after Aeon Mall Deltamas opens.

To overcome potential congestion that could disrupt economic activity around Kota Deltamas, PT Pembangunan Deltamas (a member of Sinarmas Group) decided to build a flyover. This development project was entrusted to PT Asri Karya Lestari (AKL) worth IDR 102 billion.

This project has achieved 57.87 percent progress, which has been carried out since May 2023, scheduled to be completed on March 30, 2024.

On Friday (15/12), Steel Box Girder Erection was carried out at the location of Jl. Boulevard Road Kota Deltamas, Cikarang Pusat Bekasi Regency. 

This event went smoothly and was attended by company leaders from PT. Construction of Deltamas, PT. Asri Karya Lestari as Contractor, and PT. Perentjana Djaja as a management consultant and his staff.

"The Kota Deltamas Boulevard Road flyover is planned to have a length of 700 meters with an effective width of 18 meters and the number of Bore Pile foundations as many as 280 points," said Director of PT AKL H. Sudjatmiko. 

This flyover will use a type of Steel Box Girder structure. As a construction company, PT. Asri Karya Lestari (AKL) is committed to giving full attention, especially related to traffic management, especially in the mobilization of Steel Box Girder Material and Steel Box Girder Erection.

"The Deltamas flyover is expected to overcome congestion from the direction of the Toll Gate to the Bekasi Regency Government and vice versa, from the direction of the Bekasi Regional Government to the Japek Toll Gate," he said. 

During the process of working on the Erection Steel Box Girder, PT. Asri Karya Lestari collaborates with Jasa Marga, Transportation Agency, Damkar, Police Officers, and Highway Patrol Unit to maintain the safety of road users during project work